Recommended service material

| Note required service material is also described in the following. “Starter motor components” |
Special tool

Specifications
Charging systemCooling system inspection
Inspect cooling system
every 6 000 km (4 000 miles, 6 months)
Replace engine coolant
every 2 years
Engine coolant level inspection
Hold the motorcycle vertically.
Check the engine coolant level by observing the “f” and “l” lines on
the engine coolant reservoir tank. If the level i ...
Rear brake pedal removal and installation
Removal
Remove the master cylinder assembly. Refer to “rear brake master
cylinder assembly removal and installation” .
Disconnect the rear brake light switch lead wire coupler. Refer to
“rear brake light switch inspection” .
Remove the rear brake pedal as shown in the rear ...
Special tools and equipment
Recommended service material
Note
required service material is also described in the following.
“Front wheel components” “front wheel assembly construction” “rear
wheel components” “rear wheel assembly construction”
Special tool
...