Special tools and equipment
Schematic and routing diagramBreak-in
The first 800 km (500 miles) is the
most important in the life of your
motorcycle. Proper operation during
this break-in period will help
assure maximum life and performance
from your new motorcycle.
The following guidelines explain
proper break-in procedures.
Maximum engine speed recommen ...
Wiring harness routing diagram
Wiring harness no. 2
Tapping clamp
: insert the clamp from the front side. Place the turn signal
and position light couplers in front of the clamp.
Steel clamp
: clamp the wiring harness at the blue taping point. Bend
the steel clamps to the front side.
...
Front fork disassembly and assembly
Refer to “front fork removal and installation” (page 2b-
2).
Note
the right and left front forks are installed
symmetrically and therefore the disassembly
procedure for one side is the same as that for
the other side.
Disassembly
Turn the spring pre-load adjuster (1) t ...