Engine cooling symptom diagnosis

Schematic and routing diagramRear shock absorber adjustment
After installing the rear suspension, adjust the spring
pre-load and damping force as follows:
Spring pre-load adjustment
The set length 179.3 Mm (7.06 In) provides the
maximum spring pre-load.
The set length 189.3 Mm (7.45 In) provides the
minimum spring pre-load.
Std position
184.3 ...
Thermostat removal and installation
Removal
Drain a small amount of engine coolant. Refer to “cooling system
inspection” in section 0b .
Lift and support the fuel tank. Refer to “fuel tank
removal and installation” in section 1g (page 1g-
9).
Remove the thermostat cover (1).
Remove the thermostat ( ...
Spring pre-load adjustment
To change the spring pre-load,
turn the adjuster 1 clockwise or
counterclockwise. Turning the
adjuster clockwise will increase
the spring pre-load. Turning the
adjuster counterclockwise will
decrease the spring pre-load.
There are five grooved lines on
the side of the adjuster 1 for re ...