Special tools and equipment
PrecautionsWiring harness routing diagram
Wiring harness no. 2
Tapping clamp
: insert the clamp from the front side. Place the turn signal
and position light couplers in front of the clamp.
Steel clamp
: clamp the wiring harness at the blue taping point. Bend
the steel clamps to the front side.
...
Engine oil level check
Check the engine oil level as follows:
Place the motorcycle on level
ground on the side stand.
Start the engine and allow it to
idle for a few minutes.
Stop the engine and wait three
minutes.
Hold the motorcycle vertically
and check the oil level through
...
Special tools and equipment
Recommended service material
Note
required service material is also described in the following.
“Front wheel components” “front wheel assembly construction” “rear
wheel components” “rear wheel assembly construction”
Special tool
...