Injection timing descriptionStarter motor removal and installation
Removal
Turn the ignition switch off and disconnect the
battery (–) lead wire (1).
Lift and support the fuel tank. Refer to “fuel tank
removal and installation” in section 1g (page 1g-
9).
Disconnect the starter motor lead wire (2).
Remove the starter motor (3).
...
Voltage check
If voltage is supplied to the circuit being checked, voltage
check can be used as circuit check.
With all connectors/couplers connected and voltage
applied to the circuit being checked, measure
voltage between each terminal and body ground.
If measurements were taken as shown ...
Rear shock absorber removal and installation
Removal
Remove the right side cowling and side frame covers. Refer to “exterior
parts removal and installation” in section 9d .
Support the motorcycle with a jack to relieve load on
the rear shock absorber.
Remove the left muffler and muffler chamber heat guard no. 2. Refer ...