Toyota RAV4 manuals

Suzuki GSX-R 1000 Service Manual: Turn signal / side-stand relay removal and installation

Suzuki GSX-R 1000 Service Manual / Body and accessories / Lighting systems / Repair instructions / Turn signal / side-stand relay removal and installation

Removal

  1. Remove the frame cover. Refer to “exterior parts removal and installation” in section 9d (page 9d- 6).
  2.  Remove the turn signal/side-stand relay (1).

Suzuki GSX-R. Turn signal / side-stand relay removal and installation


Installation

Install the turn signal/side-stand relay in the reverse order of removal.

Turn signal / side-stand relay inspection
Refer to “electrical components location” in section 0a . Note make sure that the battery is fully charged. Before removing the turn signal/side-stand relay, check the operation of t ...

Hazard switch inspection
Inspect the hazard switch in the following procedures:  remove the air cleaner box. Refer to “air cleaner box removal and installation” in section 1d .  Disconnect the left handleba ...

Other materials:

Ect sensor removal and installation
Removal Remove the left side cowling. Refer to “exterior parts removal and installation” in section 9d .  Drain engine coolant. Refer to “cooling system inspection” in section 0b .  Disconnect the coupler and remove the ect sensor (1). Caution take special care ...

Engine assembly installation
Install the engine in the reverse order of engine removal. Pay attention to the following points:  before installing the engine, install the collars (1). Before installing the engine, install the engine mounting thrust adjusters (2). Gradually raise the rear side of ...

Rear shock absorber adjustment
After installing the rear suspension, adjust the spring pre-load and damping force as follows: Spring pre-load adjustment The set length 179.3 Mm (7.06 In) provides the maximum spring pre-load. The set length 189.3 Mm (7.45 In) provides the minimum spring pre-load. Std position 184.3 ...

© 2011-2025 Copyright www.suzukigsxr.org