Refer to “electrical components location” in section 0a .
| Note make sure that the battery is fully charged. |
Before removing the turn signal/side-stand relay, check the operation of the turn signal light.
If the turn signal light does not illuminate, inspect the bulb, turn signal switch and circuit connection.
If the bulb, turn signal switch and circuit connection are ok, the turn signal relay may be faulty; therefore, replace the turn signal/side-stand relay with a new one.
Refer to “turn signal / side-stand relay removal and installation” .
Reflex reflector construction
Turn signal / side-stand relay removal and installationValve clearance inspection and adjustment
Inspect valve clearance
initially every 24 000 km (14 500 miles, 48 months)
Inspection
Valve clearance adjustment must be checked and
adjusted, a) at the time of periodic inspection, b) when
the valve mechanism is serviced, and c) when the
camshafts are removed for servicing.
Lift an ...
Evaporative emission control system
inspection (only for e-33)
Refer to “evaporative emission control system removal and installation (only
for e-33)” .
Hose
Inspect the hoses for wear or damage. If it is worn or
damage, replace the hose with a new one.
Note
make sure that the hoses are securely
connected.
Evap canister
Inspect the eva ...
Specifications
Service data
Electrical
unit: mm (in)
Tightening torque specifications
Reference: for the tightening torque of fastener not specified in this
section, refer to “tightening torque list” in section 0c . ...