
Throttle cable routing diagramThrottle body construction
Intake pipe
Evap system purge control solenoid valve
(e-33 only)
Evap canister (e-33 only)
Iat sensor
Isc valve hose
Ho2 sensor
Face
the clamp end left side.
Yellow
marking should face upward.
Face the
end of clamps upward and ke ...
Regulator / rectifier inspection
Inspect the regulator/rectifier in the following procedures:
turn the ignition switch off.
Disconnect the regulator/rectifier couplers. Refer to “regulator /
rectifier removal and installation” .
Measure the voltage between the terminals using the multi-circuit
tester ...
Fuel tank construction
Fuel tank heat
shield
: aluminum film side should face the engine side.
Fuel tank front cover
Fuel tank front bracket
Velcro fastenings
: clean the adhesive surface before adhering
the velcro fastenings.
Insert
to the bracket.
Apply
...