
Throttle cable routing diagramThrottle valve synchronization
Check and adjust the throttle valve synchronization
among four cylinders.
Start the engine and run it in idling condition
for
warming up.
Stop the warmed-up engine.
Lift and support the fuel tank. Refer to “fuel
tank
removal and installation” in section 1g (page ...
Rear brake hose removal and installation
Removal
Drain brake fluid. Refer to “brake fluid replacement” .
Remove the rear brake hoses as shown in the rear brake hose routing
diagram. Refer to “rear brake hose routing diagram” .
Installation
Caution
the seal washers should be replaced with
new ones to prevent ...
Vehicle side view
Note
difference between illustrations and actual
motorcycles may exist depending on the
markets.
Suzuki gsx-r1000 (2009-model)
Right side
Left side ...