
Throttle cable routing diagramTp sensor removal and installation
Refer to “throttle body disassembly and assembly” in section 1d .
Removal
Remove the throttle body. Refer to “throttle body
removal and installation” in section 1d (page 1d-
10).
Remove the tp sensor (1) with the special tool.
Special tool
: 09930–11950 (torx wrench (5 mm))
...
Symbols
Listed in the table below are the symbols indicating instructions and other
information necessary for servicing.
The meaning of each symbol is also included in the table.
Abbreviations
A:
abdc: after bottom dead center
ac: alternating current
acl: air cleaner, air cleaner box
api: ame ...
Cooling system inspection
Inspect cooling system
every 6 000 km (4 000 miles, 6 months)
Replace engine coolant
every 2 years
Engine coolant level inspection
Hold the motorcycle vertically.
Check the engine coolant level by observing the “f” and “l” lines on
the engine coolant reservoir tank. If the level i ...