Toyota RAV4 manuals

Suzuki GSX-R 1000 Service Manual: Throttle body components

Suzuki GSX-R. Throttle body components


  1. Fuel delivery pipe
  2. Fuel delivery pipe t-joint
  3. O-ring
  4. Tp sensor
  5. Stp sensor
  6. Secondary fuel injector
  7. Primary fuel injector
  8. Cushion seal
  9. Isc valve
  10. Air screw
  11. Vacuum hose
  12. Evap system purge control solenoid valve
  13. For e-33 only
  14. 3.5
    Nm (0.35 Kgf-m, 2.5 Lbf-ft)
  15. 2 Nm (0.2
    Kgf-m, 1.5 Lbf-ft)
  16. 6.5 Nm
    (0.65 Kgf-m, 4.5 Lbf-ft)
  17. 10 Nm (1.0
    Kgf-m, 7.0 Lbf-ft)


Apply engine oil.

Do
not reuse.

Throttle cable removal and installation
Removal Remove the air cleaner box. Refer to “air cleaner box removal and installation” .  Remove the right handlebar switch box. Refer to “handlebar removal and installation” in sect ...

Throttle body construction
Intake pipe Evap system purge control solenoid valve (e-33 only) Evap canister (e-33 only) Iat sensor Isc valve hose Ho2 sensor Face the clamp end ...

Other materials:

Chassis bolt and nut inspection
Tighten chassis bolt and nut initially at 1 000 km (600 miles, 2 months) and every 6 000 km (4 000 miles, 12 months) thereafter Check that all chassis bolts and nuts are tightened to their specified torque. Steering stem lock-nut 80 n·m (8.0 Kgf-m, 58.0 Lbf-ft) Stee ...

Handlebar removal and installation
Removal Remove the following parts from the left handlebar.  left handlebar switch box (1)  handlebar balancer (2)  grip rubber (3)  clutch cable (4) Remove the following parts from the right handlebar.  right handlebar switch box (5)   ...

Specifications
Service data Thermostat + radiator + fan + coolant Tightening torque specifications Note the specified tightening torque is described in the following. “Water hose routing diagram”  “water pump components”  “water pump construction” Reference: for the tig ...

© 2011-2026 Copyright www.suzukigsxr.org