
|
Throttle cable removal and installation
Throttle body constructionFuel tank construction
Fuel tank heat
shield
: aluminum film side should face the engine side.
Fuel tank front cover
Fuel tank front bracket
Velcro fastenings
: clean the adhesive surface before adhering
the velcro fastenings.
Insert
to the bracket.
Apply
...
Hazard switch inspection
Inspect the hazard switch in the following procedures:
remove the air cleaner box. Refer to “air cleaner box removal and
installation” in section 1d .
Disconnect the left handlebar switch coupler (1).
(Yellow)
Inspect the hazard switch for continuity with the
tes ...
Pair system inspection
Inspect pair system
every 12 000 km (7 500 miles, 24 months)
Inspect the pair (air supply) system periodically. Refer to “pair system
inspection” in section 1b .
Throttle valve synchronization
Inspect throttle valve synchronization
initially at 1 000 km (600 miles, 2 months) (e-33 only)
and ...