Removal
Installation
Install the throttle cables in the reverse order of removal.
Pay attention to the following points:
Refer to “throttle cable play inspection and adjustment” in section 0b .
Throttle cable inspection
Check that the throttle grip moves smoothly from full open to full close. If it does not move smoothly, lubricate the throttle cables.
Throttle cable play inspection and adjustment
Refer to “throttle cable play inspection and adjustment” in section 0b .
Continuity check
Measure resistance across coupler “b” (between “a”
and “c” in figure).
If no continuity is indicated (infinity or over limit), the
circuit is open between terminals “a” and “c”.
Disconnect the coupler “b” and measure resistance
between couplers “a” and “b-1”.
If no continuity ...
Oil cooler / oil cooler hose removal and
installation
Refer to “electrical components location” in section 0a .
Removal
Turn the ignition switch off.
Remove the left side cowling. Refer to “exterior parts removal and
installation” in section 9d .
Drain engine oil. Refer to “engine oil and filter replacement” in
section 0b .
...
Fuel line inspection
Inspect fuel line
every 6 000 km (4 000 miles, 12 months)
Inspect the fuel line in the following procedures:
lift and support the fuel tank. Refer to “fuel tank
removal and installation” in section 1g (page 1g-
9).
Inspect the fuel feed hose (1) for damage and fuel
leakage. ...