Toyota RAV4 manuals

Suzuki GSX-R 1000 Service Manual: Specifications

Service data

Electrical

Suzuki GSX-R. Service data


Tightening torque specifications

Note

the specified tightening torque is described in the following.

“Wiring harness routing diagram”

Reference

: for the tightening torque of fastener not specified in this section, refer to “tightening torque list” in section 0c .

Special tools and equipment

Recommended service material

Note

required service material is also described in the following.

“Wiring harness routing diagram”

Wiring harness routing diagram
Wiring harness no. 2 Tapping clamp : insert the clamp from the front side. Place the turn signal and position light couplers in front of the clamp. Steel clamp ...

Lighting systems
...

Other materials:

Turn signal / side-stand relay removal and installation
Removal Remove the frame cover. Refer to “exterior parts removal and installation” in section 9d (page 9d- 6).  Remove the turn signal/side-stand relay (1). Installation Install the turn signal/side-stand relay in the reverse order of removal. ...

Front wheel assembly construction
Brake disc bolt Brake caliper mounting bolt Front axle bolt Front axle pinch bolt Clearance 18 N·m (1.8 Kgf-m, 13.0 Lbf-ft) 39 N·m (3.9 Kgf-m, 28.0 Lbf-ft) 100 N·m (10 kgf-m, 72.5 Lbf-ft) 23 N·m (2.3 Kgf-m, 16.5 Lbf-ft) ...

If a collision is imminent, do something
Many riders fear locking up their brakes or haven't learned to swerve to avoid an accident. Many inexperienced riders (and too many seasoned riders) use only their rear brake in an emergency, resulting in unnecessary impacts in some cases and unnecessarily high impact speeds in other case ...

© 2011-2026 Copyright www.suzukigsxr.org