
A tool kit is provided with your motorcycle. It is located under the rear seat.
Maintenance schedule
Steering damper maintenanceFuel pump components
Fuel level gauge
Fuel pressure regulator assembly
O-ring
Joint
Fuel pump
Fuel pump case
Fuel mesh filter
10
N·m (1.0 Kgf-m, 7.0 Lbf-ft)
Apply engine oil.
Apply grease.
Do not reuse.
...
Isc valve reset
When removing or replacing the throttle body assembly,
reset the isc valve learned value in the following
procedures:
turn the ignition switch on position.
Set up the sds tools. (Refer to the sds operation
manual for further details.)
Click “active control”.
Click “is ...
Spark plug inspection and cleaning
Inspect spark plug
every 6 000 km (4 000 miles, 12 months)
Heat range
Remove the spark plugs. Refer to “ignition coil and spark plug removal
and installation” in section 1h .
Check spark plug heat range by observing electrode
color. If the electrode of the spark plug is wet
appe ...