Notice
| Maintenance, replace· ment or repair of the emission control devices and systems may be per· formed by any motorcy· cle repair establishment or individual using any motorcycle part which has been certified under the provisions in the clean air act sec. 207 (A)(2). |
Modification
Maintenance scheduleIgnition coil and spark plug removal and
installation
Removal
The hot
engine can burn you.
Wait until the engine is cool enough to touch.
Turn the ignition switch off.
Remove the air cleaner box. Refer to “air cleaner box removal and
installation” in section 1d .
Disconnect the lead wire couplers (1).
...
Fuel line inspection
Inspect fuel line
every 6 000 km (4 000 miles, 12 months)
Inspect the fuel line in the following procedures:
lift and support the fuel tank. Refer to “fuel tank
removal and installation” in section 1g (page 1g-
9).
Inspect the fuel feed hose (1) for damage and fuel
leakage. ...
Exhaust pipe bolt and muffler bolt inspection
Tighten exhaust pipe bolts and muffler bolts
initially at 1 000 km (600 miles, 2 months) and every
12 000 km (7 500 miles, 24 months) thereafter
Check the exhaust pipe bolts and muffler bolts to the
specified torque.
Tightening torque
exhaust pipe bolt (a): 23 n·m (2.3 Kgf-m, 16.5 Lbf-ft)
muf ...