Inspect the cam chain tensioner in the following procedures:

Cam chain guide inspection
Cylinder head disassembly and assemblyRear shock absorber adjustment
After installing the rear suspension, adjust the spring
pre-load and damping force as follows:
Spring pre-load adjustment
The set length 179.3 Mm (7.06 In) provides the
maximum spring pre-load.
The set length 189.3 Mm (7.45 In) provides the
minimum spring pre-load.
Std position
184.3 ...
Break-in procedures
During manufacture only the best possible materials are
used and all machined parts are finished to a very high
standard but it is still necessary to allow the moving parts
to “break-in” before subjecting the engine to maximum
stresses. The future performance and reliability of the
engine depen ...
Exhaust control system construction
Excv cable no. 1 (Cl)
Excv cable no. 2 (Op)
When
loosening or tightening the pulley bolt, be sure to fix the
pulley with an adjustable wrench, or excva may get damaged.
5 N·m (0.5 Kgf-m, 3.5 Lbf-ft)
42 – 43 Mm (1.65 – 1.69 In)
60 – 61 Mm (2.36 – ...