Schematic and routing diagramRegulator / rectifier inspection
Inspect the regulator/rectifier in the following procedures:
turn the ignition switch off.
Disconnect the regulator/rectifier couplers. Refer to “regulator /
rectifier removal and installation” .
Measure the voltage between the terminals using the multi-circuit
tester ...
Ecm / various sensors
Since each component is a high-precision part, great
care should be taken not to apply any severe impacts
during removal and installation.
Be careful not to touch the electrical terminals of the
electronic parts (ecm, etc.). The static electricity from
your body may damage them. ...
Throttle valve synchronization
Check and adjust the throttle valve synchronization
among four cylinders.
Start the engine and run it in idling condition
for
warming up.
Stop the warmed-up engine.
Lift and support the fuel tank. Refer to “fuel
tank
removal and installation” in section 1g (page ...