Schematic and routing diagramBreak-in procedures
During manufacture only the best possible materials are
used and all machined parts are finished to a very high
standard but it is still necessary to allow the moving parts
to “break-in” before subjecting the engine to maximum
stresses. The future performance and reliability of the
engine depen ...
Starter clutch inspection
Refer to “starter clutch removal and installation” .
Starter clutch
Install the starter driven gear onto the starter clutch.
Turn the starter driven gear by hand to inspect the
starter clutch for a smooth movement. The gear
turns in one direction only. If a large resistance is felt
...
Evaporative emission control system
diagram (only for e-33)
Fuel tank
Fuel-vapor separator
Fuel pump
Fuel feed hose
Fuel shut-off valve
Iap sensor
Surge hose
Evap canister
Purge hose
Evap system purge control solenoid valve
Fue
Hc vapor
Fresh air
Vacuum
...