Ignition system
Immobilizer description (for e-02, 19, 24, 51)Starter relay inspection
Inspect the starter relay in the following procedures:
remove the starter relay. Refer to “starter relay removal and
installation” .
Apply 12 v to “a” and “b” terminals and check for
continuity between the positive and negative
terminals using the multi-circuit tester. If th ...
Crankshaft thrust clearance inspection and
selection
Refer to “engine bottom side disassembly” (page 1d-
49).
Refer to “engine bottom side assembly” .
Inspection
With the crankshaft’s right-side and left-side thrust
bearings inserted into the upper crankcase.
Measure the thrust clearance “a” between the leftside
thrust bearing and ...
Ignition coil inspection
Refer to “electrical components location” in section 0a .
Ignition coil primary peak voltage
Remove the air cleaner box. Refer to “air cleaner box removal and
installation” in section 1d .
Disconnect all ignition coil. Refer to “ignition coil and spark plug
removal and installation” .
...