Visually inspect the isc valve if necessary.

Throttle body inspection and cleaning
Throttle valve synchronizationPair system inspection
Pair hose
Lift and support the fuel tank with the prop stay.
Refer to “fuel tank removal and installation” in section 1g .
Remove the air cleaner box. Refer to “air cleaner box removal and
installation” in section 1d .
Inspect the pair hoses for wear or damage. If it is worn or da ...
Chassis bolt and nut inspection
Tighten chassis bolt and nut
initially at 1 000 km (600 miles, 2 months) and every
6 000 km (4 000 miles, 12 months) thereafter
Check that all chassis bolts and nuts are tightened to
their specified torque.
Steering stem
lock-nut 80 n·m (8.0 Kgf-m, 58.0 Lbf-ft)
Stee ...
Oil jet removal and installation
Piston cooling oil jet
Removal
Remove the engine assembly. Refer to “engine assembly removal” in
section 1d .
Remove the crankshaft assembly. Refer to “engine
bottom side disassembly” in section 1d (page 1d-
49).
Remove the piston cooling oil jets (1) from the upper
cra ...