Visually inspect the isc valve if necessary.

Throttle body inspection and cleaning
Throttle valve synchronizationTurn signal / side-stand relay removal and installation
Removal
Remove the frame cover. Refer to “exterior parts
removal and installation” in section 9d (page 9d-
6).
Remove the turn signal/side-stand relay (1).
Installation
Install the turn signal/side-stand relay in the reverse
order of removal. ...
Radiator reservoir tank removal and
installation
Removal
Remove the right side cowling. Refer to “exterior parts removal and
installation” in section 9d .
Disconnect the reservoir tank inlet hose (1) from the
reservoir tank (2) and drain the engine coolant.
Remove the reservoir tank (2).
Disconnect the reservoir tank ove ...
Valve clearance inspection and adjustment
Inspect valve clearance
initially every 24 000 km (14 500 miles, 48 months)
Inspection
Valve clearance adjustment must be checked and
adjusted, a) at the time of periodic inspection, b) when
the valve mechanism is serviced, and c) when the
camshafts are removed for servicing.
Lift an ...