Toyota RAV4 manuals

Suzuki GSX-R 1000 Service Manual: Specifications

Crankshaft thrust clearance inspection and selection
Refer to “engine bottom side disassembly” (page 1d- 49). Refer to “engine bottom side assembly” . Inspection With the crankshaft’s right-side and left-side thrust bearings inserted into the ...

Service data
Valve + guide unit: mm (in Camshaft + cylinder head unit: mm (in Cylinder + piston + piston ring unit: mm (in) Conrod + crankshaft unit: mm (in) Balancer unit: mm (in) Th ...

Other materials:

Clutch parts inspection
Refer to “clutch removal”  and “clutch installation” . Clutch drive and driven plate Note wipe off the engine oil from the drive and driven plates with a clean rag. Measure the thickness of drive plates with a vernier calipers. If the drive plate thickness is found to have ...

Tightening torque list
Engine Fi system + intake air system Cooling system Chassis Tightening torque chart For other bolts and nuts not listed in the preceding page, refer to this chart: Conventional bolt “4” Marked bolt “7” Marked bolt ...

Exhaust pipe bolt and muffler bolt inspection
Tighten exhaust pipe bolts and muffler bolts initially at 1 000 km (600 miles, 2 months) and every 12 000 km (7 500 miles, 24 months) thereafter Check the exhaust pipe bolts and muffler bolts to the specified torque. Tightening torque exhaust pipe bolt (a): 23 n·m (2.3 Kgf-m, 16.5 Lbf-ft) muf ...

© 2011-2026 Copyright www.suzukigsxr.org