Removal

Installation
Installation is in the reverse order of removal. Pay attention to the following point:
M/o: molybdenum oil (molybdenum oil solution)

Side-stand / ignition interlock system parts
inspection
Starter torque limiter inspectionPair reed valve removal and installation
Removal
Lift and support the fuel tank with the prop stay.
Refer to “fuel tank removal and installation” in section 1g .
Remove the air cleaner box. Refer to “air cleaner box removal and
installation” in section 1d .
Remove the pair control solenoid valve (1) along with the ...
Break-in
The first 800 km (500 miles) is the
most important in the life of your
motorcycle. Proper operation during
this break-in period will help
assure maximum life and performance
from your new motorcycle.
The following guidelines explain
proper break-in procedures.
Maximum engine speed recommen ...
Gearshift lever height inspection and
adjustment
Inspect and adjust the gearshift lever height in the
following procedures:
inspect the gearshift lever height “a” between the
lever top and footrest.
Adjust the gearshift lever height if necessary.
Gearshift lever height “a”
standard: 65 – 75 mm (2.6 – 3.0 In)
Loosen the l ...