Toyota RAV4 manuals

Suzuki GSX-R 1000 Service Manual: Throttle body components

Suzuki GSX-R. Throttle body components


  1. Fuel delivery pipe
  2. Fuel delivery pipe t-joint
  3. O-ring
  4. Tp sensor
  5. Stp sensor
  6. Secondary fuel injector
  7. Primary fuel injector
  8. Cushion seal
  9. Isc valve
  10. Air screw
  11. Vacuum hose
  12. Evap system purge control solenoid valve
  13. For e-33 only
  14. 3.5
    Nm (0.35 Kgf-m, 2.5 Lbf-ft)
  15. 2 Nm (0.2
    Kgf-m, 1.5 Lbf-ft)
  16. 6.5 Nm
    (0.65 Kgf-m, 4.5 Lbf-ft)
  17. 10 Nm (1.0
    Kgf-m, 7.0 Lbf-ft)


Apply engine oil.

Do
not reuse.

Throttle cable removal and installation
Removal Remove the air cleaner box. Refer to “air cleaner box removal and installation” .  Remove the right handlebar switch box. Refer to “handlebar removal and installation” in sect ...

Throttle body construction
Intake pipe Evap system purge control solenoid valve (e-33 only) Evap canister (e-33 only) Iat sensor Isc valve hose Ho2 sensor Face the clamp end ...

Other materials:

Headlight removal and installation
Removal Remove the body cowling assembly. Refer to “exterior parts removal and installation” in section 9d .  Remove the air intake pipes (1). Refer to “exterior parts removal and installation” in section 9d . Remove the wiring harness no. 2 (2) By disconnecting the couplers and ...

Special tools and equipment
Recommended service material Note required service material is also described in the following. “Front brake components” Special tool ...

Gearshift shaft / gearshift cam plate removal and installation
Removal Remove the engine sprocket cover. Refer to “engine sprocket removal and installation” in section 3a .  Remove the clutch components. Refer to “clutch removal” in section 5c .  Remove the snap ring (1) and washer (2) from the gearshift shaft. Special tool : 09900–06 ...

© 2011-2026 Copyright www.suzukigsxr.org