
|
Throttle cable removal and installation
Throttle body constructionStarter torque limiter inspection
Removal
Remove the clutch cover. Refer to “clutch removal” in section 5c .
Remove the washers (1), starter idle gear no. 1 (2)
And no. 2 (3).
Remove the starter idle gear no. 2 Bearing (4), shaft
(5) and washer (6).
Hold the starter clutch with the special tool an ...
Special tools and equipment
Recommended service material
Note
required service material is also described in the following.
“Rear brake components”
Special tool
...
Fuel line inspection
Inspect fuel line
every 6 000 km (4 000 miles, 12 months)
Inspect the fuel line in the following procedures:
lift and support the fuel tank. Refer to “fuel tank
removal and installation” in section 1g (page 1g-
9).
Inspect the fuel feed hose (1) for damage and fuel
leakage. ...