Toyota RAV4 manuals

Suzuki GSX-R 1000 Service Manual: Transmission construction

Suzuki GSX-R. Transmission construction


  1. Countershaft
  2. Driveshaft
Transmission installation
Install the transmission in the reverse order of removal. Pay attention to the following points: Bearing and oil seal Caution replace the removed bearings and oil seals with new ones ...

Countershaft gear / driveshaft gear disassembly and assembly
Refer to “transmission removal”  and “transmission installation” . Disassembly Caution identify the position of each removed part. Organize the parts in their respective groups ...

Other materials:

Water pump construction
Impeller Mechanical seal Oil seal O-ring O-ring 8 N·m (0.8 Kgf-m, 6.0 Lbf-ft) 10 N·m (1.0 Kgf-m, 7.0 Lbf-ft) Apply grease. Apply engine coolant. Apply molybdenum oil solution. Do not reuse. ...

Air cleaner
The air cleaner element must be kept clean to provide good engine power and g1as mileage. If you use your motorcycle under normal low-stress conditions, you should service the air cleaner at the intervals specified. If you ride in dusty, wet, or muddy conditions, you will need to inspect the ...

Air valve removal and installation
Removal Remove the wheel assembly. Refer to “front wheel assembly removal and installation”  and “rear wheel assembly removal and installation” .  Remove the tire. Refer to “tire removal and installation” . Remove the air valve (1) from the wheel. Installation Install th ...

© 2011-2026 Copyright www.suzukigsxr.org