Toyota RAV4 manuals

Suzuki GSX-R 1000 Service Manual: Transmission construction

Suzuki GSX-R. Transmission construction


  1. Countershaft
  2. Driveshaft
Transmission installation
Install the transmission in the reverse order of removal. Pay attention to the following points: Bearing and oil seal Caution replace the removed bearings and oil seals with new ones ...

Countershaft gear / driveshaft gear disassembly and assembly
Refer to “transmission removal”  and “transmission installation” . Disassembly Caution identify the position of each removed part. Organize the parts in their respective groups ...

Other materials:

Special tools and equipment
Recommended service material Note required service material is also described in the following. “Throttle body components”  “engine bottom side assembly” Special tool ...

Crankcase breather (pcv) hose inspection
Inspect the crankcase breather (pcv) hose in the following procedures:  lift and support the fuel tank with the prop stay. Refer to “fuel tank removal and installation” in section 1g .  Inspect the crankcase breather (pcv) hose (1) for wear and damage. If it is worn or damaged ...

Water hose removal and installation
Removal Remove the side cowlings. Refer to “exterior parts removal and installation” in section 9d (page 9d- 6).  Drain engine coolant. Refer to “cooling system inspection” in section 0b .  Lift and support the fuel tank. Refer to “fuel tank removal and installation” in se ...

© 2011-2025 Copyright www.suzukigsxr.org