Toyota RAV4 manuals

Suzuki GSX-R 1000 Service Manual: Transmission construction

Suzuki GSX-R. Transmission construction


  1. Countershaft
  2. Driveshaft
Transmission installation
Install the transmission in the reverse order of removal. Pay attention to the following points: Bearing and oil seal Caution replace the removed bearings and oil seals with new ones ...

Countershaft gear / driveshaft gear disassembly and assembly
Refer to “transmission removal”  and “transmission installation” . Disassembly Caution identify the position of each removed part. Organize the parts in their respective groups ...

Other materials:

Warning / caution / note
Please read this manual and follow its instructions carefully. To emphasize special information, the symbol and the words warning, caution and note have special meanings. Pay special attention to the messages highlighted by these signal words. Indicates a potential hazard that could ...

If you don't have a helmet, buy a helmet and wear it every time you ride
Most accidents occur within a few miles of home, and almost half occur at speeds of less than 30 mph. So even if you're just going on a quick errand, be preparedstrap on your helmet before you take off. Helmets do not reduce essential vision or hearing. Generally, helmets do not cause or ...

Exhaust control system construction
Excv cable no. 1 (Cl) Excv cable no. 2 (Op) When loosening or tightening the pulley bolt, be sure to fix the pulley with an adjustable wrench, or excva may get damaged. 5 N·m (0.5 Kgf-m, 3.5 Lbf-ft) 42 – 43 Mm (1.65 – 1.69 In) 60 – 61 Mm (2.36 – ...

© 2011-2026 Copyright www.suzukigsxr.org