Toyota RAV4 manuals

Suzuki GSX-R 1000 Service Manual: Transmission construction

Suzuki GSX-R. Transmission construction


  1. Countershaft
  2. Driveshaft
Transmission installation
Install the transmission in the reverse order of removal. Pay attention to the following points: Bearing and oil seal Caution replace the removed bearings and oil seals with new ones ...

Countershaft gear / driveshaft gear disassembly and assembly
Refer to “transmission removal”  and “transmission installation” . Disassembly Caution identify the position of each removed part. Organize the parts in their respective groups ...

Other materials:

Steering tension adjustment
Check the steering movement in the following procedures:  by supporting the motorcycle with a jack, lift the front wheel unit is off the floor 20 – 30 mm (0.8 – 1.2 In).  Remove the steering damper. Refer to “steering damper construction” .  Check to make sure that the cabl ...

Drive chain replacement
Use the special tool in the following procedures, to cut and rejoin the drive chain. Note when using the special tool, apply a small quantity of grease to the threaded parts of the special tool. Special tool : 09922–22711 (drive chain cutting and joint tool set) Driv ...

Stopping and parking
Twist the throttle grip away from yourself to close the throttle completely.  Apply the front and rear brakes evenly and at the same time.  Downshift through the gears as road speed decreases.  Select neutral with the clutch lever squeezed toward the grip (disenga ...

© 2011-2026 Copyright www.suzukigsxr.org