Inspection before riding
Starting the engineExhaust control system construction
Excv cable no. 1 (Cl)
Excv cable no. 2 (Op)
When
loosening or tightening the pulley bolt, be sure to fix the
pulley with an adjustable wrench, or excva may get damaged.
5 N·m (0.5 Kgf-m, 3.5 Lbf-ft)
42 – 43 Mm (1.65 – 1.69 In)
60 – 61 Mm (2.36 – ...
Short circuit check (wire harness to ground)
Disconnect the negative (–) cable from the battery.
Disconnect the connectors/couplers at both ends of
the circuit to be checked.
Note
if the circuit to be checked branches to other
parts as shown, disconnect all connectors/
couplers of those parts. Otherwise, diagnos ...
Gearshift shaft construction
Gearshift shaft
Washer
Snap ring
Gearshift shaft return spring
Gearshift cam drive plate
Gearshift plate return spring
8.5 N·m (0.85 Kgf-m,
6.0 Lbf-ft)
13 N·m
(1.3 Kgf-m, 9.5 Lbf-ft)
19 N·m
(1.9 Kgf-m, 13.5 Lbf-ft)
Apply ...