Evaporative emission control system
diagram (only for e-33)
Pair system hose routing diagramFront wheel assembly construction
Brake disc bolt
Brake caliper mounting bolt
Front axle bolt
Front axle pinch bolt
Clearance
18 N·m (1.8 Kgf-m,
13.0 Lbf-ft)
39 N·m
(3.9 Kgf-m, 28.0 Lbf-ft)
100 N·m
(10 kgf-m, 72.5 Lbf-ft)
23 N·m
(2.3 Kgf-m, 16.5 Lbf-ft)
...
Gear position (gp) switch removal and installation
Removal
Turn the ignition switch off.
Lift and support the fuel tank. Refer to “fuel tank
removal and installation” in section 1g (page 1g-
9).
Disconnect the gear position switch lead wire
coupler (1).
Remove the engine sprocket cover. Refer to “engine sprocket r ...
Side-stand construction
Frame
Side-stand bracket
Washer
Side-stand
50 N·m (5.0 Kgf-m,
36.0 Lbf-ft)
40 N·m
(4.0 Kgf-m, 29.0 Lbf-ft)
Apply grease to sliding
surface.
...