Evaporative emission control system
diagram (only for e-33)
Pair system hose routing diagramWater pump components
Impeller
Mechanical seal
Oil seal
O-ring
O-ring
8
N·m (0.8 Kgf-n, 6.0 Ib-ft)
10 N·m
(1.0 Kgf-n, 7.0 Ib-ft)
6 N·m (0.6
Kgf-n, 4.5 Ib-ft)
13 N·m
(1.3 Kgf-n, 9.5 Ib-ft)
Apply grease.
Apply engine coolant.
Apply molyb ...
Evap canister hose routing diagram (only
for e-33)
Evap system purge control solenoid valve
Surge hose
Purge hose
Fuel shut-off valve
Rear fender
Evap canister
Seat hook
White marking
Yellow marking
Up
Face the
clamp end downward
Face the
clamp end to the left
Pass the
...
Break-in procedures
During manufacture only the best possible materials are
used and all machined parts are finished to a very high
standard but it is still necessary to allow the moving parts
to “break-in” before subjecting the engine to maximum
stresses. The future performance and reliability of the
engine depen ...