Recommended service material

| Note required service material is also described in the following. “Rear lighting system construction” |
Special tool

SpecificationsFront brake master cylinder assembly removal and installation
Removal
Drain brake fluid. Refer to “brake fluid replacement” .
Disconnect the front brake light switch coupler (1).
Place a rag underneath the brake hose union bolt (2)
on the master cylinder to catch any spilt brake fluid.
Remove the brake hose union bolt (2).
...
Side-stand construction
Frame
Side-stand bracket
Washer
Side-stand
50 N·m (5.0 Kgf-m,
36.0 Lbf-ft)
40 N·m
(4.0 Kgf-m, 29.0 Lbf-ft)
Apply grease to sliding
surface.
...
Valve clearance inspection and adjustment
Inspect valve clearance
initially every 24 000 km (14 500 miles, 48 months)
Inspection
Valve clearance adjustment must be checked and
adjusted, a) at the time of periodic inspection, b) when
the valve mechanism is serviced, and c) when the
camshafts are removed for servicing.
Lift an ...