Recommended service material

| Note required service material is also described in the following. “Rear lighting system construction” |
Special tool

SpecificationsDrive chain inspection and adjustment
Inspect drive chain
initially at 1 000 km (600 miles, 2 months) and every
6 000 km (4 000 miles, 12 months) thereafter
Drive chain visual check
With the transmission in neutral, support the
motorcycle using a jack and turn the rear wheel
slowly by hand.
Visually check the drive chain fo ...
Front wheel assembly removal and installation
Removal
Remove the brake calipers, left and right.
Caution
do not operate the brake lever with the
caliper removed.
Loosen two axle pinch bolts (1) on the right front fork
leg.
Remove the front axle bolt (2).
Raise the front wheel off the ground a ...
Fuel line inspection
Inspect fuel line
every 6 000 km (4 000 miles, 12 months)
Inspect the fuel line in the following procedures:
lift and support the fuel tank. Refer to “fuel tank
removal and installation” in section 1g (page 1g-
9).
Inspect the fuel feed hose (1) for damage and fuel
leakage. ...