Toyota RAV4 manuals

Suzuki GSX-R 1000 Service Manual: Throttle cable play inspection and adjustment

Inspect throttle cable play initially at 1 000 km (600 miles, 2 months) and every 6 000 km (4 000 miles, 12 months) thereafter

Inspect and adjust the throttle cable play “a” as follows:

Throttle cable play “a” 2.0 – 4.0 Mm (0.08 – 0.16 In)

Suzuki GSX-R. Throttle cable play inspection and adjustment


  1. Remove the boot (1).
  2.  Loosen the lock-nut (2) of the throttle pulling cable.
  3.  Turn the adjuster (3) in or out until the throttle cable play “a” (at the throttle grip) is within 2 – 4 mm (0.08 – 0.16 In).
  4.  Tighten the lock-nut (2) while holding the adjuster (3).
  5.  Fit the boot (1) positively onto the adjuster.

Suzuki GSX-R. Throttle cable play inspection and adjustment


After the
adjustment is completed, check that handlebar movement does not raise the engine idle speed and that the throttle grip returns smoothly and automatically.
Engine oil and filter replacement
Replace engine oil initially at 1 000 km (600 miles, 2 months) and every 6 000 km (4 000 miles, 12 months) thereafter Replace oil filter initially at 1 000 km (600 miles, 2 months) and every 18 0 ...

Pair system inspection
Inspect pair system every 12 000 km (7 500 miles, 24 months) Inspect the pair (air supply) system periodically. Refer to “pair system inspection” in section 1b . Throttle valve synchronization ...

Other materials:

Specifications
Service data Thermostat + radiator + fan + coolant Tightening torque specifications Note the specified tightening torque is described in the following. “Water hose routing diagram”  “water pump components”  “water pump construction” Reference: for the tig ...

Front brake components
Seal set Piston and seal set Brake pad spring Brake pad set Front brake disc 7.5 N·m (0.75 Kgf-m, 5.5 Lbf-ft) 15 N·m (1.5 Kgf-m, 11.0 Lbf-ft) 39 N·m (3.9 Kgf-m, 28.0 Lbf-ft) 18 N·m (1.8 Kgf-m, 13.0 Lbf-ft) Apply thread lo ...

Isc valve preset and opening initialization
When removing or replacing the isc valve, set the isc valve to the following procedures:  turn the ignition switch on.  Set up the sds tool. (Refer to the sds operation manual for further details.)  Click the “active control”.  Click the “isc learned value reset” (1) ...

© 2011-2025 Copyright www.suzukigsxr.org