Toyota RAV4 manuals

Suzuki GSX-R 1000 Service Manual: Transmission construction

Suzuki GSX-R. Transmission construction


  1. Countershaft
  2. Driveshaft
Transmission installation
Install the transmission in the reverse order of removal. Pay attention to the following points: Bearing and oil seal Caution replace the removed bearings and oil seals with new ones ...

Countershaft gear / driveshaft gear disassembly and assembly
Refer to “transmission removal”  and “transmission installation” . Disassembly Caution identify the position of each removed part. Organize the parts in their respective groups ...

Other materials:

Side-stand construction
Frame Side-stand bracket Washer Side-stand 50 N·m (5.0 Kgf-m, 36.0 Lbf-ft) 40 N·m (4.0 Kgf-m, 29.0 Lbf-ft) Apply grease to sliding surface. ...

Front brake master cylinder parts inspection
Refer to “front brake master cylinder / brake lever disassembly and assembly” . Master cylinder Inspect the master cylinder bore for any scratches or other damage Piston / rubber parts Inspect the piston surface for any scratches or other damage. Inspect the primary cup, secondary cup ...

Ap sensor removal and installation
Removal Remove the front seat. Refer to “exterior parts removal and installation” in section 9d (page 9d- 6).  Disconnect the starter relay (1) from the holder. Disconnect the coupler (2) and remove the ap sensor (3). Installation Install the ap sensor in the rever ...

© 2011-2026 Copyright www.suzukigsxr.org