Toyota RAV4 manuals

Suzuki GSX-R 1000 Service Manual: Transmission construction

Suzuki GSX-R. Transmission construction


  1. Countershaft
  2. Driveshaft
Transmission installation
Install the transmission in the reverse order of removal. Pay attention to the following points: Bearing and oil seal Caution replace the removed bearings and oil seals with new ones ...

Countershaft gear / driveshaft gear disassembly and assembly
Refer to “transmission removal”  and “transmission installation” . Disassembly Caution identify the position of each removed part. Organize the parts in their respective groups ...

Other materials:

Fuel injector inspection and cleaning
Inspect the fuel injector in the following procedures:  remove the fuel injector. Refer to “throttle body disassembly and assembly” in section 1d .  Check the fuel injector for evidence of dirt and contamination. If present, clean and check for presence of dirt in the fuel lin ...

Oil pressure indicator inspection
Inspect the oil pressure indicator in the following procedures: Note before inspecting the oil pressure switch, check if the engine oil level is correct. Refer to “engine oil and filter replacement” in section 0b . Remove the left side cowling. Refer to “exterior parts remov ...

Rear view mirror construction
Body cowling Cowling brace Cushion Turn signal lead wire Turn signal lead wire coupler : locate the turn signal lead wire coupler (5) between the mirror cover (6) and mirror body (7). Mirror cover Mirror body 10 N·m (1.0 Kgf-m, 7.0 L ...

© 2011-2026 Copyright www.suzukigsxr.org