Toyota RAV4 manuals

Suzuki GSX-R 1000 Service Manual: Transmission construction

Suzuki GSX-R. Transmission construction


  1. Countershaft
  2. Driveshaft
Transmission installation
Install the transmission in the reverse order of removal. Pay attention to the following points: Bearing and oil seal Caution replace the removed bearings and oil seals with new ones ...

Countershaft gear / driveshaft gear disassembly and assembly
Refer to “transmission removal”  and “transmission installation” . Disassembly Caution identify the position of each removed part. Organize the parts in their respective groups ...

Other materials:

Throttle cable routing diagram
Throttle cable no. 1 Throttle cable no. 2 Clutch cablev Front brake hose Pass the throttle cables in front of the front brake hose. Pass the clutch cable above the right air intake pipe. Clamp the clutch cable at the white taping point and m ...

Special tools and equipment
Recommended service material Note required service material is also described in the following. “Rear lighting system construction” Special tool ...

Rear wheel removal
Place the motorcycle on the side stand. Remove the cotter pin 1.  Remove the axle nut 2. Warning A hot muffler can burn you. The muffler will be hot enough to burn you for some time after stopping the engine. Wait until the muffler cools to avoid bur ...

© 2011-2026 Copyright www.suzukigsxr.org