Transmission installation
Countershaft gear / driveshaft gear
disassembly and assemblyFuel line inspection
Inspect fuel line
every 6 000 km (4 000 miles, 12 months)
Inspect the fuel line in the following procedures:
lift and support the fuel tank. Refer to “fuel tank
removal and installation” in section 1g (page 1g-
9).
Inspect the fuel feed hose (1) for damage and fuel
leakage. ...
Rear shock absorber removal and installation
Removal
Remove the right side cowling and side frame covers. Refer to “exterior
parts removal and installation” in section 9d .
Support the motorcycle with a jack to relieve load on
the rear shock absorber.
Remove the left muffler and muffler chamber heat guard no. 2. Refer ...
Cmp sensor removal and installation
Removal
Remove the air cleaner box. Refer to “air cleaner box removal and
installation” in section 1d .
Remove the pair control solenoid valve. Refer to “pair control solenoid
valve removal and installation” in section 1b .
Disconnect the coupler (1) and remove the cmp
se ...