Evaporative emission control system
diagram (only for e-33)
Pair system hose routing diagramTurn signal / side-stand relay removal and installation
Removal
Remove the frame cover. Refer to “exterior parts
removal and installation” in section 9d (page 9d-
6).
Remove the turn signal/side-stand relay (1).
Installation
Install the turn signal/side-stand relay in the reverse
order of removal. ...
Water pump construction
Impeller
Mechanical seal
Oil seal
O-ring
O-ring
8
N·m (0.8 Kgf-m, 6.0 Lbf-ft)
10 N·m
(1.0 Kgf-m, 7.0 Lbf-ft)
Apply grease.
Apply engine coolant.
Apply molybdenum oil
solution.
Do not reuse.
...
Thermostat inspection
Inspect the thermostat in the following procedures:
remove the thermostat. Refer to “thermostat removal and installation” .
Inspect the thermostat pellet for signs of cracking.
Test the thermostat at the bench for control action.
Caution
do not contact ...