Special tools and equipment
PrecautionsGearshift shaft construction
Gearshift shaft
Washer
Snap ring
Gearshift shaft return spring
Gearshift cam drive plate
Gearshift plate return spring
8.5 N·m (0.85 Kgf-m,
6.0 Lbf-ft)
13 N·m
(1.3 Kgf-m, 9.5 Lbf-ft)
19 N·m
(1.9 Kgf-m, 13.5 Lbf-ft)
Apply ...
Break-in
The first 800 km (500 miles) is the
most important in the life of your
motorcycle. Proper operation during
this break-in period will help
assure maximum life and performance
from your new motorcycle.
The following guidelines explain
proper break-in procedures.
Maximum engine speed recommen ...
Water hose removal and installation
Removal
Remove the side cowlings. Refer to “exterior parts
removal and installation” in section 9d (page 9d-
6).
Drain engine coolant. Refer to “cooling system inspection” in section
0b .
Lift and support the fuel tank. Refer to “fuel tank
removal and installation” in se ...