Emission control devices
Fuel injection system descriptionTransmission removal
Remove the engine assembly from the frame. Refer to “engine assembly
removal” in section 1d .
Remove the engine top side. Refer to “engine top side disassembly” in
section 1d .
Separate the upper and lower crankcases. Refer to “engine bottom side
disassembly” in section 1 ...
Continuity check
Measure resistance across coupler “b” (between “a”
and “c” in figure).
If no continuity is indicated (infinity or over limit), the
circuit is open between terminals “a” and “c”.
Disconnect the coupler “b” and measure resistance
between couplers “a” and “b-1”.
If no continuity ...
Chassis bolt and nut inspection
Tighten chassis bolt and nut
initially at 1 000 km (600 miles, 2 months) and every
6 000 km (4 000 miles, 12 months) thereafter
Check that all chassis bolts and nuts are tightened to
their specified torque.
Steering stem
lock-nut 80 n·m (8.0 Kgf-m, 58.0 Lbf-ft)
Stee ...