Diagnostic information and procedures
Drive chain related componentsFront turn signal light removal and installation
Removal
Remove the screw.
Disconnect the front turn signal coupler (1).
Remove the turn signal light assembly (2).
Installation
Install the front turn signal light in the reverse order of
removal. ...
Ignition system check
Remove the spark plugs and
reattach them to the spark
plug caps.
Put the engine stop switch in
the "" position and ignition
switch in the "on" position.
While holding a spark plug
with its base firmly against the
engine, push the electric
starter butt ...
Valve clearance inspection and adjustment
Inspect valve clearance
initially every 24 000 km (14 500 miles, 48 months)
Inspection
Valve clearance adjustment must be checked and
adjusted, a) at the time of periodic inspection, b) when
the valve mechanism is serviced, and c) when the
camshafts are removed for servicing.
Lift an ...