Engine coolant solution
Location of partsThrottle valve synchronization
Check and adjust the throttle valve synchronization
among four cylinders.
Start the engine and run it in idling condition
for
warming up.
Stop the warmed-up engine.
Lift and support the fuel tank. Refer to “fuel
tank
removal and installation” in section 1g (page ...
Clutch installation
Install the primary driven gear assembly (1).
Caution
if it is difficult to install the primary driven
gear, rotate the crankshaft.
Be sure to engage the oil pump drive
sprocket with the primary driven gear.
Install the spacer (2) and bea ...
Combination meter removal and installation
Removal
Remove the combination meter mounting bolt (1).
Bushing
Disconnect the coupler (2) and remove the
combination meter assembly (3).
Installation
Install the combination meter in the reverse order of
removal.
Note
fix the boot of ...