Precautions
Clutch lever position switch inspectionRear shock absorber adjustment
After installing the rear suspension, adjust the spring
pre-load and damping force as follows:
Spring pre-load adjustment
The set length 179.3 Mm (7.06 In) provides the
maximum spring pre-load.
The set length 189.3 Mm (7.45 In) provides the
minimum spring pre-load.
Std position
184.3 ...
Pair system inspection
Inspect pair system
every 12 000 km (7 500 miles, 24 months)
Inspect the pair (air supply) system periodically. Refer to “pair system
inspection” in section 1b .
Throttle valve synchronization
Inspect throttle valve synchronization
initially at 1 000 km (600 miles, 2 months) (e-33 only)
and ...
Evap canister hose routing diagram (only
for e-33)
Evap system purge control solenoid valve
Surge hose
Purge hose
Fuel shut-off valve
Rear fender
Evap canister
Seat hook
White marking
Yellow marking
Up
Face the
clamp end downward
Face the
clamp end to the left
Pass the
...