Exhaust control system operation
Exhaust control system constructionWater pump components
Impeller
Mechanical seal
Oil seal
O-ring
O-ring
8
N·m (0.8 Kgf-n, 6.0 Ib-ft)
10 N·m
(1.0 Kgf-n, 7.0 Ib-ft)
6 N·m (0.6
Kgf-n, 4.5 Ib-ft)
13 N·m
(1.3 Kgf-n, 9.5 Ib-ft)
Apply grease.
Apply engine coolant.
Apply molyb ...
Battery current leakage inspection
Inspect the battery current leakage in the following
procedures:
turn the ignition switch off.
Remove the front seat. Refer to “exterior parts
removal and installation” in section 9d (page 9d-
6).
Disconnect the battery (–) lead wire.
Measure the current betwee ...
Speed sensor inspection
Inspect the speed sensor in the following procedures:
remove the speed sensor. Refer to “speed sensor removal and
installation” .
Connect a 12 v battery (between b and b/w), 10 kù
resistor (between b/r and b) and multi-circuit tester
(tester (+) probe to b and tester ...