Exhaust control system operation
Exhaust control system constructionThrottle valve synchronization
Check and adjust the throttle valve synchronization
among four cylinders.
Start the engine and run it in idling condition
for
warming up.
Stop the warmed-up engine.
Lift and support the fuel tank. Refer to “fuel
tank
removal and installation” in section 1g (page ...
Side-stand removal and installation
Removal
Support the motorcycle with a jack or wooden block.
Caution
do not support the motorcycle with the exhaust pipes.
Make sure that the motorcycle is supported securely.
Remove the side-stand as shown in the side-stand construction.
Refer to ...
Water pump construction
Impeller
Mechanical seal
Oil seal
O-ring
O-ring
8
N·m (0.8 Kgf-m, 6.0 Lbf-ft)
10 N·m
(1.0 Kgf-m, 7.0 Lbf-ft)
Apply grease.
Apply engine coolant.
Apply molybdenum oil
solution.
Do not reuse.
...